Monday, May 14, 2007

Drop Stitch Progress

I worked on the sleeves to my Drop Stitch T-Shirt from the SNB calendar. The stitches have been dropped and sleeves are bound off. There are ruffles knit into the front and back of the lower arm edges. You can see the size difference between the sleeves from pre to post dropping stitches. I knit the sleeves both to 12.5 inches to start. I haven't measured the finished sleeves, but they look substantially larger to me.

The color is closer to true in the progress shot, rather than the finshed sleeve photo.

No comments: